Summary of Contents for Fronius Symo Hybrid BYD B-BOX HV

  • Page 1 / Perfect Charging / Perfect Welding / Solar Energy Installations instructions Fronius Symo Hybrid BYD B-BOX HV Grid-connected inverter Wiring examples 42,0426,0318,EN 012-22112018...
  • Page 3: Table Of Contents

    Contents General ..............................General remarks ........................... Cabling variants including emergency power circuits and 3-pin separation e.g. Austria or Australia ..Circuit diagram............................Functions .............................. Cabling for emergency power circuit and non-emergency power circuits..........Transition from feeding energy into the grid to emergency power mode..........Transition from emergency power mode to feeding energy into the grid ..........
  • Page 5: General

    General General remarks The examples illustrated in this document (particularly cabling variants and circuit dia- grams) are suggestions only. These examples have been carefully developed and tested, and may therefore be used as the basis for an installation. Anyone following or using these examples does so at their own risk.
  • Page 6: Cabling Variants Including Emergency Power Circuits And 3-Pin Separation E.g. Austria Or Australia

    The following points regarding cabling must be considered: The main contacts of contactors K1 and K2 must be installed between the Fronius Smart Meter and the residual-current circuit breaker of the inverter or the residual-cur- rent circuit breaker of the emergency power circuits.
  • Page 7: Transition From Feeding Energy Into The Grid To Emergency Power Mode

    Public grid available again energy into the The Fronius Smart Meter monitors the grid parameters on the public grid and passes grid this information to the inverter. After a defined measuring period, the restored public grid is deemed to be stable.
  • Page 8: Cabling Variants Including Emergency Power Circuits And 4-Pin Separation E.g. Germany

    The rest of the home network is not supplied with power in this case. The following points regarding cabling must be considered: The main contacts of contactors K1 and K2 must be installed between the Fronius Smart Meter and the residual-current circuit breaker of the inverter or the residual-cur- rent circuit breaker of the emergency power circuits.
  • Page 9: Transition From Feeding Energy Into The Grid To Emergency Power Mode

    Fronius Symo Hybrid because this emergency power network has a fre- quency of 53 Hz. Transition from The public grid is monitored by the inverter's internal grid and system protection unit feeding energy and by the Fronius Smart Meter connected to it.
  • Page 10: Description Of Components

    Description of components Description of Fronius Smart Meter components for Type: Fronius Smart Meter 63 A full version Fronius item number: 43,0001,1473 230 (400) V - 240 (415) V 10 (63) A / 50 Hz - 60 Hz Modbus RTU communication...
  • Page 11: Appendix

    Appendix...
  • Page 12: Byd 3-Pin Separation Austria

    BYD 3-pin separation Austria DC= IN Verdrahtungsvorschlag Wiring suggestion PV-GENERATOR Fronius Symo Hybrid BESTEHENDE HAUSINSTALLATION Battery: BYD B-Box H 6,4 - 11,5 EXISTING DOMESTIC INSTALLATION 3-pin seperation - Austria POTENTIALAUSGLEICHSSCHIENE MEN - LINK FRONIUS SYMO HYBRID =A1+A4.1 HYBRID MANAGER ETHERNET EIGENSTÄNDIGE NETZUMSCHALTBOX...
  • Page 13: Byd 3-Pin Separation Australia

    BYD 3-pin separation Australia DC= IN Verdrahtungsvorschlag Wiring suggestion PV-GENERATOR Fronius Symo Hybrid Battery: BYD B-Box H 6,4 - 11,5 3-pin seperation - Australia BESTEHENDE HAUSINSTALLATION EXISTING DOMESTIC INSTALLATION FRONIUS SYMO HYBRID POTENTIALAUSGLEICHSSCHIENE MEN - LINK =A1+A4.1 HYBRID MANAGER ETHERNET =A2.1...
  • Page 14: Byd 4-Pin Separation Germany

    BYD 4-pin separation Germany DC= IN Verdrahtungsvorschlag Wiring suggestion PV-GENERATOR Fronius Symo Hybrid Battery: BYD B-Box H 6,4 - 11,5 4-pin seperation - Germany BESTEHENDE HAUSINSTALLATION EXISTING DOMESTIC INSTALLATION POTENTIALAUSGLEICHSSCHIENE MEN - LINK Fronius Symo Hybrid =A1+A4.1 Hybrid Manager ETHERNET EIGENSTÄNDIGE NETZUMSCHALTBOX...
  • Page 15: Byd Wiring Recommendation

    BYD wiring recommendation DC= IN Verdrahtungsvorschlag Wiring suggestion PV-GENERATOR BESTEHENDE HAUSINSTALLATION Fronius Symo Hybrid EXISTING DOMESTIC INSTALLATION Battery: BYD B-Box H 6,4 - 11,5 POTENTIALAUSGLEICHSSCHIENE MEN - LINK FRONIUS SYMO HYBRID =A1+A4.1 HYBRID MANAGER MAX 25A FRONIUS ETHERNET SMART METER =A2.1...
  • Page 16 Fronius Worldwide - www.fronius.com/addresses Fronius International GmbH Fronius USA LLC Solar Electronics Division 4600 Wels, Froniusplatz 1, Austria 6797 Fronius Drive, Portage, IN 46368 E-Mail: pv-sales@fronius.com E-Mail: pv-us@fronius.com www.fronius.com www.fronius-usa.com Under www.fronius.com/addresses you will find all addresses of our sales branches and partner firms!