Set-Up
Section 1
Installation and start-up must be performed by Thermo approved
personnel only.
s
The distance between the condensing unit and the blast freezer can be no
more than 100 equivalent feet (includes tubing, elbows, traps, etc.).
Thermo Scientific
Blast Freezer
1-1