First Alert FA147C Installation Instructions Manual page 15

Table of Contents

Advertisement

Installing the Control and RF Receiver Circuit Boards Together in the Cabinet (Figure 2Ð3)
1. Hang two short (black) mounting clips (provided with receiver) on the raised cabinet tabs,
as shown in Detail B in Figure 2Ð3.
2. Insert the top of the receiver board (removed from its own case as described in its
instructions) into the slots at the top of the cabinet, as shown in Detail A in Figure 2Ð3.
Make sure that the board rests on the correct row of tabs, as shown.
3. Swing the base of the board into the mounting clips and secure it to the cabinet with the
accompanying screws (see Detail B in Fig. 2Ð3).
4. Insert the top of the control's board into the slot in the clips and position two long (red)
clips at the lower edge of the board (see Detail C).
5. Swing this board into place and secure it with two additional screws.
6. Insert grounding lugs (supplied with the receiver) through the top of the cabinet into the
left-hand terminals of the antenna blocks (at the upper edge of the receiver board) and
secure them to the cabinet top with the screws provided, as shown in Detail D.
7. Insert the receiver's antennas through the top of the cabinet, into the blocks' right-hand
terminals, and tighten the screws.
8. Setup and wiring of the receiver is contained in the Wireless (RF) Zone Expansion (5800 RF
Systems) section.
ÊÊSection 2. Installing the Control
Figure 2Ð3.
Installing The PC Board
And RF Receiver (if used)
Together In The Cabinet
2Ð3

Advertisement

Table of Contents
loading

Table of Contents