mWing
Installation and assembly
1.
Place and align base plate.
NOTICE
Wrong orientation of the pedestrian gate! The pedestrian gate is not sym-
metrically constructed. Align the pedestrian gate so that the passage side
is on the correct side. Note figure base plate.
2.
Draw the outline of the base plate on the floor. Make sure that the mark-
ings are either washable or invisible.
3.
Put the base plate aside. The underside must face upwards.
4.
Clean the floor with the "HaftClean" surface cleaner.
5.
Clean the underside of the base plate with the surface cleaner "HaftClean
Metall".
6.
Apply construction adhesive "Klebt + D Dicht Power" to the floor in the
form of a beat within the marking. Apply less construction adhesive to-
wards the edge.
Fig. 20:
7.
Immediately place the base plate on the construction adhesive. Observe
markings.
Fig. 21:
8.
Press the base plate on well immediately. If the base plate stands out due
to unevenness of the floor, weight the base plate.
50
Apply construction adhesive
Place base plate
Need help?
Do you have a question about the MHTM FlowMotion mWing and is the answer not in the manual?
Questions and answers