DISASSEMBLY INSTRUCTION
NOTE
1.
When installing the Clamper Magnet, install it with the
green face up.
2.
When installing the wire of the Lever Switch, install it
correctly as Fig. 3-4-B.
3.
When installing the Lever Switch, install it correctly as
Fig. 3-4-C.
4.
In case of the Lever Switch installation, hook the wire
on the Main Frame as shown Fig. 3-4-D.
Lever Switch
The Lever should be position
between A and B.
A
Rack Loading
3-5:
TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 3-5-A)
1.
Remove the Traverse Holder.
2.
Remove the 2 Insulator (F).
Main Chassis Ass'y
Insulator (F)
(Black)
Traverse Holder
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 3-5-B.
Red
White
Blue
From DVD PCB
Fig. 3-4-B
B
Fig. 3-4-C
Lever Switch
Fig. 3-4-D
Insulator (F)
(Black)
Fig. 3-5-A
Main Chassis Ass'y
3-6: SWITCH PCB ASS'Y (Refer to Fig. 3-6-A)
1.
Remove the screw
2.
Remove the Switch PCB Ass'y.
Switch PCB Ass'y
Main Chassis Ass'y
• Screw Torque: 4± 0.5kgf•cm
NOTE
1.
When installing the wire of the Switch PCB, install it
correctly as Fig. 3-6-B.
2.
When installing the wire of the Switch PCB, while
pressing it in the direction of the arrow as shown Fig. 3-
6-B, then instal it.
Main Chassis Ass'y
3-7: RACK FEED ASS'Y (Refer to Fig. 3-7-A)
1.
Remove the screw
2.
Remove the Rack Feed 1/2 Spring, Rack Feed 1/2 and
Rack Feed Lever.
Rack Feed 1 Spring
Rack Feed 2 Spring
Rack Feed Lever
Rack Feed 1
• Screw Torque: 3.5± 0.5kgf•cm
- 11 -
Traverse Holder
Fig. 3-5-B
1
.
1
Fig. 3-6-A
Switch PCB Ass'y
Black
From Relay PCB
White
Fig. 3-6-B
1
.
1
Rack Feed 2
Main Chassis Ass'y
Fig. 3-7-A