Start-up and testing
It is possible to test the machine independently from a connection to an alarm control panel, acting
directly on the COM, ARM and FOG terminals.
It is possible to test the system using "drinking water" instead of the liquid with which the mist is
produced, a dry and transparent but "noisy" steam will come out of the appliance, in this way it is
possible to test the interface with the alarm control panel.
Tank Installation
STARTUP
Connect the 12V Battery (if DT-Power200 is available)
If DT-Power200 is not installed, supply the "IN-12+" terminal with 12V from the power plant.
Activate the 230V power supply
ARM the appliance using "ARM", when it is ready the "Heat" light will flash
Activate the shot using "FOG"
To interrupt the "shot" cycle, it is necessary to disarm the appliance by opening the ARM contact or
releasing FOG.