9 Service Position
Note: For description of the disassembly procedures, see the Section 8
9.1.
Checking of SMPS P.C.B.
Step 1 : Remove Front Ornament Unit (L) & (R).
Step 2 : Remove Front Panel Block.
Step 3 : Remove SMPS Unit.
Step 4 : Remove SMPS P.C.B..
Step 5 : Remove screw.
Step 6 : Release 5P wire from the slots.
Step 7 : Release catches.
Step 8 : Remove Bridge P.C.B..
Step 9 : Place a Support Block to support Front Panel Block as
shown.
Step 10 : Connect 14P FFC at connector (CN941) on Bridge
P.C.B..
Step 11 : Place SMPS P.C.B. on the Insulating Material.
Step 12 : Connect 7P extension cable (REX1538) from P1700
on SMPS P.C.B. to CN1100 on Main P.C.B..
47