Page 1
INSTALLATION MANUAL UL2 Front Mount ODELS 4400 FM 6600 FM 915 W. Blue Starr Dr. Claremore, OK 74017 (918)341-6811 Pub. 10/14/08...
Page 2
AC GROUND FAULT CIRCUIT INTERRUPTER (GFCI) DEVICE WHICH IS TO BE USED IN SERIES WITH THE USER’S PRIMARY AC POWER SOURCE. THE GFCI IS AN INTEGRAL PART OF THE HYDROHOIST BOAT LIFT AND IS DESIGNED TO OFFER A LIMITED MEASURE OF PROTECTION TO THE USER AGAINST HAZARDOUS ELECTRICAL CONDITIONS OR SHOCKS SHOULD THEY OCCUR.
Page 3
HydroHoist Marine Group Model: 4400/6600/ UL2FM Publication: 10/14/08 CONTENTS Getting Started - Section 1 Site Preparation - Section 2 Assembly - Section 3 Installation - Section 4 Final Adjustments - Section 5 Trouble Shooting - Section 6 Parts List - Section 7...
Getting Started HydroHoist Marine Group Sec. 1 Pg. 1 Model: 4400/6600/ UL2FM Publication: 10/14/08 Getting Started Assembly should be done on a flat, level surface. Assembly Platform A flat-bed trailer is preferred, but a boat trailer with planks across the frame will work, provided...
Confirm that there is sufficient dock structure for the Dock Brackets. ♦ The HydroHoist 4000FM requires a minimum of 7 feet, the 6000FM requires a minimum of 7 feet 9 inches of water depth in which to operate. Confirm that there is sufficient water depth at all times of the year.
Page 6
Assembly Instructions Description The assembly instructions presented within this section represent the steps for assembling the Model 4400FM & 6600FM HydroHoist Boat Lift. It is recommended that before assembling the components, you read and understand each procedural step to become familiar with how all parts are assembled.
Assembly HydroHoist Marine Group Sec. 3 Pg. 3 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Tank Location Align the Tanks [1] parallel with each other and with the Air Injection Nipple to the front of the hoist assembly and in the 6 o'clock position.
Page 9
Assembly HydroHoist Marine Group Sec. 3 Pg. 4 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Tank Bracket Assembly Fig. B Place the tube brackets [9] in the longitudinal channels which span the top of Fig B the tanks. Step Procedure...
Page 10
Assembly HydroHoist Marine Group Sec. 3 Pg. 5 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Channel Assembly Attach front and rear Cross Channel [11] to Single Piece Tank Brackets[10]. Note: Position Cross Channel [11] with flanges of Channel to rear of hoist.
Page 11
Assembly HydroHoist Marine Group Sec. 3 Pg. 6 Model: 4400/6600/ UL2FM Publication: 10/14/08 The parts installed in the next steps may have to be moved to better fit the bottom of the boat after it has Note.. been lifted. Accurate measurements of the boat’s hull before assembly and careful attention to these steps may prevent repositioning the parts over the water.
Page 12
Assembly HydroHoist Marine Group Sec. 3 Pg. 7 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Under the Frame Sections [13 & 14] suspend by rope or chain, a 2 X 4 X 8 foot board Frame Weldment as shown in Fig. G Assembly Fig.
HydroHoist Marine Group Assembly Model: 4400/6600/ UL2FM Sec. 3 Pg. 8 Publication: 10/14/08 Step Procedure Mooring Tube Determine the location of the Mooring Tube Assembly: FM 4400 - the rear Cross Channel [11] is preferred, the center Cross Channel is Fig.
HydroHoist Marine Group Assembly Model: 4400/6600/ UL2FM Sec. 3 Pg. 9 Publication: 10/14/08 Step Procedure Hose Assembly Cut Hose [16] in half and secure one end of each hose to the nipple of the tank and one end to the valve in the control. Secure with Hose Clamps.
Page 15
I n s t a l l a t i o n Installation Installation HydroHoist Marine Group Sec.4 Pg. 1 Sec.4 Pg. 1 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Move the hoist fully into the boat stall and position the Mooring Tube [19] 2 inches Selecting Position for from the side of the dock.
Page 16
Installation HydroHoist Marine Group Sec.4 Pg. 2 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Attach Pivot Connecting Bracket [7], with the pivot hole 10 inches above the water Front Mooring line, to Vertical Angle [32] . Fasteners per Bracket: (2 ea.) 1/2" x 1-1/2" bolt, nut &...
Page 17
Installation HydroHoist Marine Group Sec.4 Pg. 3 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Side Mooring Assemble Mooring Collar Assembly [20] to Side Dock Bracket [8]. Fasteners: (2 ea.) 3/8" x 4-1/2" Bolt, Nut and Lockwasher. Note: The Collar Assembly may be...
Page 18
Installation HydroHoist Marine Group Sec.4 Pg. 4 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Rotate the Control Unit Handle to the Lift/Launch position. Note: It may be Lowering the Hoist necessary to turn blower on for three or four seconds to purge any water trapped in the air hoses;...
Page 19
Installation HydroHoist Marine Group Sec.4 Pg. 5 Model: 4400/6600/ UL2FM Publication: 10/14/08 Step Procedure Lifting the Boat Hold the front of the boat centered over the hoist, pushing the boat to stern gently until the Guide Ropes are taut. The Guide Ropes center the boat's stern over the hoist, and keep the transom aligned over the Hull Support Pads.
WIND OR WATER destructive conditions exist, it is recommended that mooring CONDITIONS lines be secured from dock structure to bow and stern of craft to offer an additional measure of protection to the HydroHoist Mooring Apparatus and craft. End of Section 5...
HydroHoist Marine Group Trouble Shooting Model: 4400/6600/ UL2FM Sec. 6 Pg. 1 Publication: 10/14/08 Trouble Shooting Hoist will not completely lift boat from water or stern remains low. CONDITION: A. Boat loaded too far to rear. CAUSE: B. Water or equipment in boat creating additional weight.
Page 22
Parts List HydroHoist International, Inc. HydroHoist Marine Group Sec. 7 Pg. 1 Model: 4000FM & 6000FM Model: 4400/6600/ UL2FM Publication: 4/1/00 Publication: 10/14/08 Parts List 44/66 FM 5015500 TANK ASSEMBLY - UL2 4400 5015510 TANK ASSEMBLY - UL2 6600 4442000 PAD ASSY.-12' HULL SUPT.
Need help?
Do you have a question about the 4400 FM and is the answer not in the manual?
Questions and answers