3.2. Unpacking
Carefully unpack the UPS, then carefully locate the UPS onto the site which has
selected, with all the points in section 3.1 kept in mind.
The UPS has had detailed production and QC testing of all the electrical and
mechanical characteristics prior to shipment from the factory. Therefore, the UPS
should be in proper condition upon receipt. Once received, the UPS should be first
checked visually to determine if any physical damage has occurred during
transportation.
Then check to insure that all the accessories/options (match with your purchase order)
have been included.
- DOOR KEY
- THIS INSTRUCTION MANUAL
- BATTERY FUSE (FOR BATTERY CABINET ONLY)
- SPARE SCREWS FOR COVER PLATE
- SPARE SCREWS FOR CONNECTION TERMINALS etc.
Lastly, check to insure that the specification of the UPS is identical to the
specification of your order. The key items in the specification you must check are:
- RATED POWER OF THE UPS,
- INPUT VOLTAGE & FREQUENCY
- OUTPUT VOLTAGE & FREQUENCY
- NO. OF OUTPUT PHASES (1Φ OR 3Φ)
- BATTERY VOLTAGE OR CELL NO.
Also check to insure that the necessary documentation is attached:
- GUARANTEE CARD
- AGENT/SERVICE CENTER INFORMATION
3-5
Need help?
Do you have a question about the Triathlon III and is the answer not in the manual?