3. INSTALLATION

3.1. Site & Environment Considerations
The main function of the UPS is to provide an safe, clean independent electrical
supply to the load so that it is free from any random variations, disturbances or
interruptions of the utility Mains. The UPS also provides a constant power supply
which is perfectly regulated in both voltage and frequency. And when the Mains are
not available, the UPS can provide optimal back-up time depending on the battery
bank capacity connected to it.
Usually the life expectancy of the UPS is 5 to 10 years (batteries are not included,
because life expectancy of batteries depend on the type of battery, the temperature and
humidity of the environment in which it is installed, and the type of charger that is
applied to the battery). Therefore optimal life expectancy of the UPS can be achieved
by careful consideration of the site and environment.
The following precautions and recommendations should be checked in considering the
site and environment of the UPS:
(a) The UPS should be located in a place with adequate ventilation (refer to the
specification of the heat dissipation of the UPS). If the UPS is installed indoors,
care must be taken in insuring the evacuation of heat from a closed room.
(b) Adequate space (at least 1M) should be allowed to open the door, unobstructed
by other objects, for operation or maintenance. Adequate space (at least 1M)
should be allowed at the top of the UPS, because heat dissipation is ventilated
through the top openings.
(c) Do not put any objects on the top of the UPS that may obstruct ventilation. Do
not locate the UPS near any heat source, machinery which produce metallic dust
or powder, or any facility that will produce corrosive substances or vapor.
(d) Protect the UPS from accidental damage from fire extinguishing (sprinkler)
systems. Protect the UPS from abnormal conditions with a dedicated cutoff from
the incoming power.
3-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Triathlon III and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

T3ups-33-700k

Table of Contents