Note:
It is important use an accurate periodically calibrated high voltage meter.
1. Set the brightness to minimum.
2. Set the service switch to the service position.
3. Measure the High Voltage. The meter reading should indicate 31.5
± 1.0 kV . If the meter indication is out of tolerance, immediate
service and correction is required to prevent the possibility of
premature component failure.
4. To prevent an X-Radiation possibility, it is essential to use the
specified projection tube.
2. Chassis Board Layout
6