Vaillant aroTHERM plus VWL 35/6 A 230V S2 Operating Instructions Manual page 46

Hide thumbs Also See for aroTHERM plus VWL 35/6 A 230V S2:
Table of Contents

Advertisement

AIR TO WATER HEAT PUMP COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Customer name:
Address:
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (PRINT NAME):
Company name:
Company address:
CONTROLS - SYSTEM AND HEAT PUMP (tick the appropriate boxes)
Time and temperature control to heating
Time and temperature control to hot water
Hot water zone valves
Thermostatic radiator valves
Automatic bypass to system
Buffer Vessel Fitted
ALL SYSTEMS
What system cleaner was used?
What inhibitor was used?
Is the system adequately frost protected?
OUTDOOR UNIT
Are all external pipeworks insulated?
Is the fan free from obstacles and operational?
Has suitable consideration been made for waste water discharge?
CENTRAL HEATING MODE
Heating Flow Temperature
DOMESTIC HOT WATER MODE Measure and Record:
Is the heat pump connected to a hot water cylinder?
Hot water has been checked at all outlets
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected:
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations
All electrical work complies with the appropriate Regulations
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the heat pump and system controls have been demonstrated to the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
© Heating and Hotwater Industry Council (HHIC)
46
Room thermostat and programmer/timer
Load/weather compensation
Cylinder thermostat and programmer/timer
Yes
No
°C
Unvented
Yes
Gas Boiler
Telephone number:
Telephone number:
Commissioning date:
Combined with Heat pump main controls
Fitted
Fitted
Fitted
Built In
Fitted
Fitted
If YES
Volume:
Heating Return Temperature
Vented
Thermal Store
Electric Heater
Solar Thermal
Installation and maintenance instructions 0020330791_00
Programmable Roomstat
Not required
Not required
Not required
Provided
Not required
Not required
Litres
Yes
Yes
Yes
Yes
Quantity
litres
Yes
Yes
Yes
Yes
°C
Not Connected
Yes
Not required
Yes
Yes
Yes
Yes
Yes
www.centralheating.co.uk

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arotherm plus vwl 55/6 a 230v s2Arotherm plus vwl 75/6 a 230v s2

Table of Contents