Hook-Up - Smeg SIM61BDE Manual To Installation And Use

Table of Contents

Advertisement

1 1 / INSTALLING YOUR APPLIANCE
EN
Connection
Your appliance should be positioned so that the mains switch is accessible.
These hobs must be connected to the mains using a socket in compliance with publication CEI
60083 or an all-pole circuit-breaker device in compliance with the installation rules in force.
When power is first supplied to your hob, or after an extended power cut, an indicator light will
appear on the control panel. This information will disappear after 30 seconds.
• Hook-up of 220-240V
(SIM61B - SIM62B - SIM942B)
Blue
Brown
L L
N N
Neutral Phase
• 220-240 V monophase
hook-up(SIM91B)
3 3 2 2 amp fuses.
Brown
Blue
Green/yellow
Green/yellow
Bleu
Brown
6 6 3 3 amp fuse.
Brown
Blue
Green/yellow
Green/yellow
Blue
Brown
Warning
If the cable is damaged it must be replaced by the manufacturer, its after-sales service
or a person with a similar qualification to prevent danger.
~
Green/yellow
32A
Earth
L L
Phase
2 2 0 0 A A
N N
Neutral
Earth
Earth
3 3 2 2 A A
N N
Neutral
L L
Phase
L L
Phase
N N
Neutral
Earth
Connection SIM62BDE
220-240V
~
Blue
Brown
N N
Neutral Phase
2x230V 2L+2N
Separate the wires before connection
Brown
Blue
N N 1 1
N N 2 2
Neutral
• 400V 2N
~
Separate the 2 phase wires L1 and L2 before
connection
Brown
Blue
N N
Neutral
With hook-up of 400 V 2N three phase, verify
that the neutral wie is properly connected
6
Black - grey
Green/yellow
L L
Earth
- 16A
~
Black - grey
Green/yellow
L L 1 1 L L 2 2
Phase
Earth
- 16A
Black - grey
Green/yellow
L L 1 1 L L 2 2
Earth
Phase
32A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sim62bSim62bdeSim91bSim942bSim61b

Table of Contents