Table Of Contents - ECR International Dunkirk DCBF-75 Manual

Condensing gas fired boiler
Table of Contents

Advertisement

Verify Contents Received ...............................................2

Table Of Contents ..........................................................3

Physical Data.................................................................4
1 - Important Information .............................................7
2 - Introduction .............................................................8
2.4 Use Of Carbon Monoxide Monitor ............................8
2.5 Designated Use ....................................................8
2.6 The Unit Must Not:................................................8
2.7 Operational Features .............................................8
3 - Component Listing ...................................................9
4 - Locating Boiler .......................................................15
4.1 Boiler Location Considerations ............................15
4.2 Floor Location ....................................................15
4.3 Clearances ........................................................16
5 - Combustion Air And Vent Piping .............................17
5.1 General .............................................................17
System ...................................................................18
5.3 Definitions .........................................................18
5.4 Approved Venting Materials .................................19
5.5 Vent Termination ................................................19
5.6 Coaxial Venting Instructions .................................21
5.7 Coaxial Vent Screw Placement .............................22
5.8 Twin Pipe Systems ..............................................23
5.10 Twin Pipe CPVC Adapter Kit Installation ...............24
5.11 Twin Pipe Polypropylene Adapter Kit Installation...........25
5.14 Flexible Vent System ........................................29
5.15 Condensate Piping ............................................31
6 - Hydronic Piping ......................................................32
6.1 General .............................................................32
6.2 Special Conditions ..............................................32
6.3 Safety Relief Valve And Air Vent ...........................33
6.4 Trim Piping .........................................................33
6.5 System Piping ....................................................33
6.8 Central Heating System .......................................37
6.9 Frost Protection Mode ..........................................37
6.11 Pump Protection ...............................................37
7 - Gas Supply Piping ..................................................38
7.1 General .............................................................38
7.2 Gas Pipe Recommendations .................................39
7.3 Leak Check Gas Piping ........................................41
7.4 Gas Orifice ........................................................41
8 - Electrical Connections ............................................42
8.1 General .............................................................42
8.2 Electrical Connections .........................................42
8.3 Access To Connection Block..................................43
8.4 Main Supply Connection ......................................43
8.5 Install Room Thermostat .....................................44
8.7 Indirect Storage Tank ..........................................46
8.9 Management Of 0-10v Input ................................46
TABLE OF CONTENTS
9 - Start Up Procedure .................................................48
9.1 Central Heating System Connections - Heat Only ...48
9.3 System Start Up .................................................49
9.4 Fill Condensate Trap With Water ...........................49
9.5 Control Panel......................................................50
9.6 Prior To Commissioning .......................................51
9.7 Commissioning For The First Time ........................51
9.8 Automatic Calibration Function .............................51
9.9 Manual Calibration Function: ................................52
9.10 De-Aeration Function .........................................52
9.11 Changing The Type Of Gas .................................52
9.12 Chimney Sweep Function ..................................53
9.14 Check Firing Rate ..............................................54
9.15 Parameter Settings ...........................................54
9.17 Adjusting Maximum Heating Power .....................57
10 - Operating Instructions .........................................58
10.2 Boiler Operation ................................................58
10.3 Central Heating Mode ........................................58
10.4 Domestic Hot Water Mode ..................................59
10.5 Frost Protection ................................................59
10.6 Pump ..............................................................59
11 - General Maintenance And Cleaning ......................60
24
11.1 Beginning Of Each Heating Season ......................60
.........
25
11.4 Draining The Boiler ...........................................62
11.5 Draining The Heating Circuit ...............................62
11.6 Hydraulic Unit (DHW) ........................................63
11.7 Cleaning The Cold Water Filter ............................63
11.8 Final Commissioning .........................................63
11.9 Final Assembly .................................................63
11.10 User Information .............................................64
11.11 Safety Flue Thermostat. ...................................64
11.12 Flue Pressure Switch. ......................................64
11.13 Replacement Parts ..........................................64
12 - Ratings And Capacities .........................................65
12.1 Ratings And Capacity.........................................65
12.3 High Altitude Ratings .........................................66
12.4 High Altitude Chart............................................66
12.5 Available Boiler Pump Head ................................67
13 - Trouble Shooting ..................................................68
Report The Anomaly Values. ......................................70
14 - Glossary ...............................................................71
Appendix A - Wiring Diagrams ............................... 73-78
3
240013509 REV A, [03/15/2022]

Advertisement

Table of Contents
loading

Table of Contents