Verify Contents Received - ECR International Dunkirk DCBF-75 Manual

Condensing gas fired boiler
Table of Contents

Advertisement

Fully Assembled Boiler
DHW Optional Pipe
Heat Only Boiler
* Verify proper model size before use.
For Parts lists see manual 240013510 included
with your boiler literature package.
NOTICE
Using proper brazing or soldering technique,
insert copper flush bushing into copper tee
with threading up and non-threaded end down.
If the threaded end is not UP the TP gauge
cannot engage the threads in the bushing.

VERIFY CONTENTS RECEIVED

30 PSI Safety Relief
Valve
Copper Flush Bushing
1/2" x 1/4" NPT
Temperature Pressure
Gauge (2" Shank)
Copper Tee
1-1/4" x 1-1/4 "x 1/2"
Threaded End
Non-Threaded
End
Copper Tee
2
3/4 NPT Ball Gas
Shutoff Valve
Includes Essential
Documents and Warranty
11x17 Wire Diagrams
Document Package
240013509 REV A, [03/15/2022]

Advertisement

Table of Contents
loading

Table of Contents