April Identiti AP6000 Installation Instructions

Square edge bath screen

Advertisement

Square Edge Bath Screen
Item Number:AP6000
INSTALLATION INSTRUCTIONS
This product should be installed by a suitably qualified and proficient person. The fitting instructions should be
followed carefully to ensure a proper and safe installation. Failure to follow these instructions could result in future
injury.
These instructions and list of parts assume that installation is done against solid/tiled walls.
Please check this product for damage prior to starting the installation. No claims can be made after the product has
been fitted.
PLEASE NOTE :The minimum and maximum adjustment sizes noted on the product brochures are based on
perfectly plumb walls and trays.
IMPORTANT
USE SAFETY EYE-WEAR WHEN DRILLING
www.aprilproducts.co.uk
Lifetime Product Guarantee
ATTENTION!
The Lifetime Product Guarantee is only valid
once the April Guarantee Registration Form
has been completed and returned within
30 days of installation.
In addition the product must be used and
maintained in accordance with the
manufacturer's instructions
(guarantee excludes seals and magnets).
Please see our website for full Terms &
Conditions.
To activate your Product Guarantee please visit
www.aprilproducts.co.uk and complete the
online form.

Tools Required

6
2.75
PH2 TYPE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Identiti AP6000 and is the answer not in the manual?

Questions and answers

Summary of Contents for April Identiti AP6000

  • Page 1 Lifetime Product Guarantee ATTENTION! The Lifetime Product Guarantee is only valid once the April Guarantee Registration Form has been completed and returned within 30 days of installation. In addition the product must be used and maintained in accordance with the manufacturer’s instructions...
  • Page 2 COMPONENTS AND BOX CONTENTS Box Contents Description Description Wall profile Moving panel Upright profile Bottom seal Frame profile Wall plug Vertical seal Screw ST4 Profile Top cap Screw ST3.5 Pivot part 1 Screw cover cap Pivot part 2 Pivot part 3 IMPORTANT - Missing Components Please check this product for missing components prior to installation For spare parts visit www.aprilproducts.co.uk...
  • Page 3 Ф 6 drill bit Ф2.75 drill bit Step 1: Position the wall profile (1) onto the bath , approximately 12-15mm from the outside bath edge to ensure that the screen runs along the inside edge of the bath rim. (A). Step 2: Level the profile with a spirit level , then mark the position using a pencil.
  • Page 4 Silicone the outside of the vertical wall post and also the outside of the bottom of the wall post as diagram shown above. Bottom seal 24 HRS DO NOT USE THE ENCLOSURE FOR 24 HOURS AFTER SEALING Allow 24 hours before use for Silicone the set.
  • Page 5 It is important to clean your April shower enclosure after every use. Please wipe down all glass and metal parts with a clean soft cloth. Ensure that all residual water on the glass is removed after every use. For reliable, watertight performance from your April enclosure your shower head should not be positioned so that the shower sprays directly onto the enclosure door.

Table of Contents