Step 2-Determine Unit Clearances - Trane 4YCZ6036A Installer's Manual

Single packaged gas/electric 16 seer convertible, 3 - 5 ton, 64 - 120 kbtu r-410a
Table of Contents

Advertisement

Installer's Guide
Step 2—Determine Unit Clearances
Figures 1 through 6 show the unit critical dimensions.
NOTE: The view labeled "Bottom
Side" represents the Base
as viewed looking up from
underneath the unit.
Figure 1. 4YCZ6036A (1 of 3)
Page 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

4ycz6060a

Table of Contents