Chapter 2 Installing The Bbu; Installation Procedure; Putting Setup Date Label - NEC N8103-7153 User Manual

Raid battery backup unit
Table of Contents

Advertisement

45

Chapter 2 Installing the BBU

This chapter explains the installation of the BBU in the server.

1. Installation Procedure

To install the BBU in the RAID controller, see the following procedure.
Before the installation, refer to a User's Guide of servers and RAID controllers.

1-1. Putting Setup Date Label

Fill the year and month when the BBU is installed in the RAID controller on the battery label
coming with the cover. We suggest to fill in the setup date label and to put it on the battery
case.
The shelf life of the battery pack is about 2 years though actual life depends on
the operating environment and conditions.
Replace such a battery pack to a new one as soon as possible following
"Chapter 3."
Set up Date
Y
. M

Advertisement

Table of Contents
loading

Table of Contents