Install The Dd9500 System Into A Rack; Attach Front Rail Adapter; Warning About Lifting The System - Dell DD9500 Manual

Table of Contents

Advertisement

Figure 13. Attach front rail adapter
9. Repeat the steps for the second rail.
10. After installing both rails, make sure that they are level with one another.
11. For HA systems, repeat this procedure for the second node.

Install the DD9500 system into a rack

About this task
CAUTION:
Data Domain systems are heavy. Always use two people or a mechanical lift to move a system. The
chassis displays warning signs.
Figure 14. Warning about lifting the system
CAUTION:
● Do not apply AC power to the DD9500 system controller until all expansion shelves and cables are installed.
● Make sure the PSNT label, attached to the left rear of the chassis is not damaged or snagged during the
installation of the system into the rack.
Install the System in the Rack
19

Advertisement

Table of Contents
loading

Table of Contents