Download Print this page

Tools And Materials Required - Kohler ADAIR K-5306T Installation Instructions Manual

4.0l exposed class five one-piece toilet

Advertisement

TOOLS AND MATERIALS REQUIRED (Not
supplied)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Toilet gasket (wax seal)
·
Toilet installation flange
·
Toilet T-bolts (2), 8mm (5/16") diameter
·
Toilet supply shut-off valve, 10mm(3/8 ) recommended
NOTICE:
If the existing toilet does not have a supply shut-off
valve below the tank, install one before installing the new
toilet.
* Flexible hose are recommended to connect the supply line
to the fill valve. If you use a rigid connection, take care not to
apply side forces to the bottom of the fill valve.
Reference Value
405
Finished
Wall
305
1264349-T01-A
"
680
Kohler reserves the right to change marked dimensions without prior notice.
·
254mm
·
305mm
·
·
·
·
·
·
·
·
·
·
8mm T
·
*
381
390
Supply
-2-
2
10mm
594
252
140
135
Unit: mm
:
265
696

Advertisement

loading

This manual is also suitable for:

Adair k-75925tAdair k-5306t-sAdair k-4636t-u