TOOLS AND MATERIALS NEEDED FOR INSTALLATION

You will need a drill with a 1/8" bit to install sheet metal screws into connector pipe. A 5/16" socket/wrench or
screw driver to install the room air deflector, and blower assembly described in this manual. A 1/2" socket/wrench
to install the flue collar. A non-combustible floor protector as specified in this manual. All chimney and chimney
connector components required for your particular chimney installation.

BLOWER ASSEMBLY

The blower assembly must be disconnected from the
source of electrical supply before attempting the
installation. The blower assembly is intended for use only
with a stove that is marked to indicate such use. Do
not route the supply cord near or across hot surfaces!
Fix the assembly to the back of the stove with the four
screws provided.
ASH PAN ASSEMBLY
Remove ash pan from firebox. Under the firebox, there
are two brackets; Slide the ash pan into these brackets.
Assembly Instructions
-3-
FLUE COLLAR ASSEMBLY
Mount the flue collar to the top of the unit as shown
using the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3)
weld tabs provided in the parts box.
FIREBRICK CONFIGURATION
Replace the Firebrick as shown in the illustration.
5/16-18 x 1-1/2
BOLT
WASHER
GASKET
HEATER
TOP
WELD
TAB