REEL BELT, LOADING RACK ASSEMBLY, S/T SLANT POLE ASSEMBLY
REMOVAL
1) Turnover the DECK MECHANISM and remove the
REEL BELT (1).
2) Remove one POLY WASHER (2).
3) Remove the LOADING RACK ASSEMBLY (3).
4) Remove R and L LOADING ASSEMBLIES (4&5).
5) Remove the S and T SLANT POLES (6&7) by pulling
them in the direction of the arrows.(Fig.21)
CAUTION
Take care not to get the GUIDE ROLLERS of the S/T SLANT
POLES stained with grease.
When reassembling, please refer to Fig.22.
LOADING RACK
HOLE OF LOADING RACK
CIRCULAR MARK ON LOADING GEAR (R)
Assembly of the Right & Left Loading Assembly & Loading Rack Assembly
Reel belt, loading rack assembly, right & left loading assemblies
& supply and takeup slant pole assembly removal
LOADING GEAR (R)
LOADING GEAR (L)
NOTCH IN LOADING GEAR (R)
Fig.22.
14
Fig.21.
TRIANGLE MARK ON
LOADING GEAR (L)