Dometic DC-Kit6 Installation And Operating Manual page 14

Dc extension kit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installing and connecting the DC Kit
7.5
Connecting the FJ1100, FJ1700, FJ2200, FJ2600,
FJ3200 Dometic roof air conditioner
➤ Remove the outlet panel of the roof air conditioner, if necessary also remove the
upper cover ( FJ1100, FJ1700, FJ2200, FJ2600, FJ3200) (fig. 4, page 4).
➤ Join on/off cable for FJ1100, FJ1700, FJ2200, FJ2600, FJ3200 to the plug
connector on the circuit board (fig. 5, page 4).
I
NOTE
Guide the on/off cable carefully past the fan.
➤ Join the universal connection cable to the on/off cable of the FJ1100, FJ1700,
FJ2200, FJ2600, FJ3200.
➤ Connect the universal connection cable with connections I2 and I5 of the
charging current distributor ( ECL-103) (fig. 1, page 3).
➤ Attach the outlet panel of the roof air conditioner ( FJ1100, FJ1700, FJ2200,
FJ2600, FJ3200) (fig. 4, page 4).
➤ Run the connection cable of remote control MCR-9 to the inverter and connect
( MSI2324T).
7.6
Connecting the DC Kit to the power supply
➤ Check that all the connections have been made in accordance with the
instructions.
➤ Check that the roof air conditioner is closed properly.
➤ Connect the electrical connections of the components ( ECL-103).
➤ Connect the positive battery cables to the batteries.
➤ Check the following are working properly:
– Check the on and off values for the charging voltage regulator
– Check the priority circuit
– Switch on the air conditioning in driving mode ( air conditioning)
– Switch on the air conditioning on mains operation
14
DC-Kit6
EN

Advertisement

Table of Contents
loading

Table of Contents