Dryer Enclosure Requirements - American Dryer AD-202 Installation Manual

Phase 7 / f.s.s. – gas – dsi / steam / dual timer
Table of Contents

Advertisement

C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible material.
NOTE: Allowances must be made for opening the control door.
A 38-inches (96.52 cm) recommended minimum clearance for loading the dryer.
B The maximum thickness of the bulkhead for gas dryers is 4-inches (10.16 cm). For electric and steam
dryers the maximum thickness of the bulkhead is 1-inch (2.54 cm) within 3-inches (7.62 cm) from the top of
the control door.
C For gas and electric dryers a minimum overhead clearance of 12-inches (30.48 cm) is required, providing no
sprinkler is located above the dryer. For steam dryers or if a sprinkler is located above the dryer, 18-inches
(45.72 cm) is required.
D Dryer should be positioned 12-inches (30.48 cm) away from the nearest obstruction and 24-inches (60.96
cm) is recommended for ease of installation, maintenance, and service.
E 2-inch (5.08 cm) minimum is required for opening the control door.
F
Flooring should be level or below dryer cabinet for ease of removing panels during maintenance.
G Dryers may be positioned sidewall to sidewall, however a 1/16" (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door, along with the removal of panels during maintenance.
113289 - 10
www.adclaundry.com
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adg-202drMl-202Mlg-202dr

Table of Contents