Unpacking / Setting Up - American Dryer AD-202 Installation Manual

Phase 7 / f.s.s. – gas – dsi / steam / dual timer
Table of Contents

Advertisement

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint buildup.
IMPORTANT: The dryer must be installed in a location/environment, which the ambient
temperature remains between 40° F (4.44° C) and 130° F (54.44° C).
B. UNPACKING / SETTING UP
Remove protective shipping material (i.e. plastic wrap and/or optional shipping box) from dryer.
IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid
the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts
located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint
door in place.
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or
other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.
b. The V-belts are disconnected from the tumbler drive motor for shipping. Reconnect V-belts before
starting the dryer.
113289 - 10
www.adclaundry.com
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adg-202drMl-202Mlg-202dr

Table of Contents