Download Print this page

Mercia Garden Products 01OSBP0604SDFW-V1 General Instructions Manual

6x4 osb pent

Advertisement

Quick Links

General Instructions
01OSBP0604SDFW-V1
6X4 OSB PENT
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01OSBP0604SDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OSBP0604SDFW-V1

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2: Pre-Assembly

    01OSBP0604SDFW-V1 Please retain product label and instructions for future reference Overall Dimensions: Length = 1220mm Width = 1811mm Nail Bag Height = 2055mm Turn Button Felt Tacks x 50 T Hinge Pad Bolt Base Dimensions: Qty 2 Qty 3 Qty 1...
  • Page 3 Please retain product label and instructions for future reference Step 1 Step 3 Fix the corners with 50mm Place the floor on a firm and level base, screws as shown in diagram. ensure the base has suitable drainage free from areas where standing water can collect. 9x50mm Screws See the front page for base requirments.
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 5 Fix the eaves frame to the Once the roof is fixed roof sheet using 4x30mm attach the building to screws for each sheet. the floor with 50 mm 4x30mm Screws screws.
  • Page 5 Step 7 Step 8 Fit the Cover Trims to the left Cut the felt into 2 x 1890mm long sheets and right of the building as shown in the illustration using and lay onto roof as shown in diagram 30mm screws. Trim the length ensuring there is overhang around the of the cover trims to the sides.
  • Page 6: After Treatment

    Please retain product label and instructions for future reference Step 11 Step 10 Fix the pad bolt with 6x30mm Use 4x30mm screws to fix screws to the horizontal brace each beading strip onto the on the door. Then fix the pad door panel.