For The Installer; About The Box; Overview: About The Box; Outdoor Unit - Daikin RXYSQ4T7V1B Installation And Reference Manual

Vrv iv-s system air conditioner
Hide thumbs Also See for RXYSQ4T7V1B:
Table of Contents

Advertisement

▪ Installer and user reference guide:
▪ Preparation
of
the
installation,
reference data,...
▪ Detailed step-by-step instructions and background information
for basic and advanced usage

For the installer

3

About the box

3.1

Overview: About the box

This chapter describes what you have to do after the box with the
outdoor unit is delivered on-site.
It contains information about:
▪ Unpacking and handling the units
▪ Removing the accessories from the units
Keep the following in mind:
▪ At delivery, the unit must be checked for damage. Any damage
must be reported immediately to the carrier's claims agent.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor
damage.
▪ Choose on beforehand the path along which the unit is to be
brought in.
RXYSQ4~6T7V1B+Y1B
VRV IV-S system air conditioner
4P404676-1A – 2016.03
technical
specifications,
▪ Format: Digital files on
http://www.daikineurope.com/support-
and-manuals/product-information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
3.2

Outdoor unit

3.2.1

To unpack the outdoor unit

1
2
3.2.2

To handle the outdoor unit

Carry the unit slowly as shown:
CAUTION
To avoid injury, do NOT touch the air inlet or aluminum fins
of the unit.
Forklift. As long as the unit remains on its pallet, you can also use a
forklift.
3 About the box
Installer and user reference guide
7

Advertisement

Table of Contents
loading

Table of Contents