Download Print this page

Advertisement

Quick Links

1
Introduction
2
3
4
Reference
5
TPA5051EVM Schematic Diagram
1
2
TPA5051 in I
3
TPA5051 in Right-Justified Mode
4
TPA5051 in I
5
Top Layer of the TPA5051EVM
6
Bottom Layer of the TPA5051EVM
7
TPA5051EVM Top Layer
8
TPA5051EVM Second Layer
9
TPA5051EVM Third Layer
10
TPA5051EVM Bottom Layer
1
1
Introduction
1.1
The TPA5051 evaluation module (EVM) consists of a single TPA5051 audio delay device, along with other
external components mounted on a printed-circuit board (PCB) that can be used to independently delay
two digital audio streams. Each digital audio stream consists of a left and right channel, both of which can
be delayed up to 4095 samples (with a 48-kHz sampling rate, that equates to more than 85ms of delay).
The TPA5051EVM is designed to work seamlessly with the TI Input USB board, but can function as a
stand-alone board for pass-through testing in any system. All that is required is an I
2
I
C controller, and a 5-V supply.
The TPA5051EVM also includes an onboard digital-to-analog controller (DAC), the PCM1606, which can
2
convert I
S or left-justified data to an analog out. The analog out is filtered on the board and can be
viewed with a scope probe.
National Instruments is a trademark of National Instruments Corporation.
SLOU184 - July 2006
Submit Documentation Feedback
Contents
..........................................................................................
.............................................................................................
............................................................................................
............................................................................................
.............................................................
List of Figures
2
S Mode With Separate Delays for Left and Right Channels
2
S Mode With Frame Delay
................................................................
2
S Mode - Unable to Communicate
..................................................................
..............................................................
..........................................................................
.....................................................................
.......................................................................
.....................................................................
List of Tables
....................................................................................
........................................................
..............................................
User's Guide
SLOU184 - July 2006
TPA5051EVM
1
2
6
9
12
.................
3
4
5
6
7
8
9
9
10
10
11
2
S audio source, an
TPA5051EVM
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the TPA5051EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPA5051EVM

  • Page 1: Table Of Contents

    4095 samples (with a 48-kHz sampling rate, that equates to more than 85ms of delay). The TPA5051EVM is designed to work seamlessly with the TI Input USB board, but can function as a stand-alone board for pass-through testing in any system. All that is required is an I S audio source, an C controller, and a 5-V supply.
  • Page 2: Software

    The included compact disk (CD) has all the software and drivers necessary to properly operate the TPA5051EVM with the TI Input USB board. This software is designed to work only with personal computers (PC). The installation software consists of TPA505x Interface SAA, Command Tool, and .Net Framework 1.1.
  • Page 3 (DATA1 of the device). Selecting the Channel 2 tab allows control of the registers for digital audio input 2 (DATA2 of the device). See Figure 2 Figure 1. TPA5051 in I S Mode With Separate Delays for Left and Right Channels SLOU184 – July 2006 TPA5051EVM Submit Documentation Feedback...
  • Page 4 Software Figure 2. TPA5051 in I S Mode With Frame Delay TPA5051EVM SLOU184 – July 2006 Submit Documentation Feedback...
  • Page 5 Software Figure 3. TPA5051 in Right-Justified Mode SLOU184 – July 2006 TPA5051EVM Submit Documentation Feedback...
  • Page 6: Operation

    Quick Start List for Use With the TI Input USB Board Follow these steps to use the TPA5051EVM with the TI Input USB board. This requires a digital or analog audio source, a 5-V power supply, and the included USB and ribbon cables.
  • Page 7 5. Connect the USB cable from the USB jack on the PC to the J350 USB Interface on the TI Input USB board. 6. For additional delay, another TPA5051EVM can be added in series using the 16-pin and 34-pin ribbon cables.
  • Page 8 Operation Figure 6. Bottom Layer of the TPA5051EVM Operation 1. Turn on the power supply for the TPA5051EVM. 2. Start the TPA505x software. 3. Depress the reset button on the TI Input USB board. 4. To play to music through digital audio input 1 (DATA1), insert a signal source into the TI Input USB board.
  • Page 9 Reference Reference TPA5051EVM PCB Layers Figure 7. TPA5051EVM Top Layer Figure 8. TPA5051EVM Second Layer SLOU184 – July 2006 TPA5051EVM Submit Documentation Feedback...
  • Page 10 Reference Figure 9. TPA5051EVM Third Layer Figure 10. TPA5051EVM Bottom Layer TPA5051EVM SLOU184 – July 2006 Submit Documentation Feedback...
  • Page 11 Reference TPA5051EVM Bill of Materials Table 1. Bill of Materials Part No. QTY Value Description Distributor No. Manufacturer Part No. R1, R2, R3, 100k 100K, 1/10W, 0603, 5% P100KGCT-ND Panasonic R4, R5 ERJ-3GEYJ104V R6, R7, R8, 10k, 1/10W, 0603, 5%...
  • Page 12: Bill Of Materials

    Part No. QTY Value Description Distributor No. Manufacturer Part No. EXB- 8 Resistor array, 39-Ω, 5%, 1/16W Y1390TR-ND Panasonic 2HV390JV EXB-2HV390JV TPA5051EVM Schematic Diagram The TPA5051EVM schematic diagram is appended to this page. TPA5051EVM SLOU184 – July 2006 Submit Documentation Feedback...
  • Page 14 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 15 TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...

This manual is also suitable for:

Tpa5051Tpa5050