Page 1
Quick Start CTRL Rev01 03/04/2020 CTRL is the range of 36V DC digital controllers installed with the barrier applications. 1. Typical installation (purely for information) Power supply H07RN-F 3x1,5 mm double insulated cable Photocell - Receiver 5 x 0.5 mm double insulated cable (max.
2. Electrical connections F4ES-F4S R85/60 Series CS/STD BATTERIES 1 2 3 2 3 4 5 2 x 12V 4,5Ah POWER SUPPLY 230Vac / 115Vac BATTERY CHARGER BATTERY (+) BATTERY (-) PROG TEST SEC2 SEC1 10 11 12 13 14 15 16 17 19 20 ENC2 LED LIGHT...
Page 3
4. Before starting ... a) IMPORTANT: Select the length of the boom with the parameter A1. It is very important that this parameter is selected correctly. An incorrect setting may cause severe damage or injury. AG/004 up to 3 m up to 3 m KB/004 BI/004HP...
5. Acquisition procedure 1. Press and hold PROG for 4 s. 2. APP- appears on the display. 3. Open the release cover. 4. The barrier opens 45° degree (when properly balanced). 5. PHAS appears. 6. Wait until the message PHAS flashes. 7.
Page 5
9. Photocells grounding connection Grounding connection negative terminal (COM) photocells series F4ES/F4S or other than Roger Technology In case of malfunction, or failure to intervene in case of dimming, or continuous detection, or abnormal behaviour of the automation (gate, overhead door, barrier, etc.), it is advisable to connect the negative terminal (COM) of the photocells to the grounding of the system.
Need help?
Do you have a question about the CTRL and is the answer not in the manual?
Questions and answers