Stopping The Engine - ABB A135-M65 Operation Manual

Hide thumbs Also See for A135-M65:
Table of Contents

Advertisement

Operation Manual / A130-M.. - A145-M..
7
Operation and service
 Load profile (thermal cycling, also number of starts/stops, emergency shutdowns)
 Gas inlet temperature
 Frequency and execution of turbine and compressor cleaning
 Turbocharger specification.
For bearing parts
 Lubricating oil quality (oil filtering, oil condition, oil monitoring)
 Load profile (speed, pressure conditions, temperature)
 Imbalance of the rotor (degree of contamination)
7.4

Stopping the engine

Stopping the engine
In the turbocharger, the heat from the lubricating oil that continues to circula-
te must be dissipated.
CAUTION
Let the engine continue to run at idling speed for 5 to 10 minutes before
stopping it.
Observe the oil pressure specified for engine idling (see Table 5).
Post-lubrication
 Post-lubrication is not required and not recommended for water-cooled bearing casings.
 For oil-cooled bearing casings, post-lubrication is mandatory for 20 minutes if the turbine
inlet temperature (t
– 550 °C with insulated casing
– 600 °C with non-insulated casing
At temperatures below the specified values, post-lubrication for 10 minutes is recom-
mended.
Observe the oil pressure specified for post-lubrication (see Table 5).
© Copyright 2013 ABB. All rights reserved.
) exceeds the following values when the engine is stopped:
TE
HZTL2413_EN
Page 58 / 113
Revision B
March 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht611391

Table of Contents