About This Document - Huawei RRU3942 Installation Manual

Hide thumbs Also See for RRU3942:
Table of Contents

Advertisement

RRU3942
Installation Guide
Purpose
This document describes the process of installing a DC RRU3942 (referred to as RRU in this
document).
Product Version
The following table lists the product version related to this document.
Product Name
DBS3900
Intended Audience
This document is intended for:
Base station installation engineers
Organization
1 Changes in the RRU3942 Installation Guide
This chapter describes the changes in the RRU3942 Installation Guide.
2 Installation Preparations
This chapter describes the reference documents, tools, and instruments that must be ready before
the installation. In addition, it specifies the skills and prerequisites that installation engineers
must have.
3 Information About the Installation
Before installing an RRU, you must be familiar with its exterior, ports, installation options,
physical supports, and installation clearance requirements.
4 Unpacking the Equipment
Unpack and check the delivered equipment to ensure that all the materials are included and intact.
Issue ()
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

About This Document

Product Version
V100R004C00 and later versions
About This Document
ii

Advertisement

Table of Contents
loading

Table of Contents