Huawei RRU3942 Installation Manual page 49

Hide thumbs Also See for RRU3942:
Table of Contents

Advertisement

RRU3942
Installation Guide
The hoist clamp on the main mounting bracket is secured properly.
Context
Figure 6-23
Figure 6-23 Top view of the RRU
(1) U-steel
Procedure
Step 1 Determine a position for installing the main mounting bracket.
l
l
Issue ()
shows the top view of the RRU installed on U-steel.
If the RRU must be installed on a tower, see
RRU
to determine a position.
If the RRU must be installed on the ground, see
Figure 6-24 Distance between the main mounting bracket and the ground
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3.5.1 Installation Clearance for a Single
Figure 6-24
to determine a position.
6 Installing the RRU
41

Advertisement

Table of Contents
loading

Table of Contents