Installation; Space Requirements; Installation Process - Mitsubishi Electric E1041 Installation Manual

Table of Contents

Advertisement

2

Installation

2.1 Space Requirements

– Installation plate thickness: 1.5 - 7.2 mm (0.06 - 0.28 inch)
– Space requirements when installing the operator panel:
119 mm
(4.69 inch)
50 mm
(2.0 inch)
Caution
The openings on the enclosure are for air convection. Do not cover these
openings.

2.2 Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator panel is to be situated, draw along the
outer sides of the holes and cut according to the markings.
Mitsubishi Electric, MA00818C
100 mm
(4.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
155.8 mm
(6.13 inch)
Panel cut out 139 x 105 mm
(5.47 x 4.13 inch)
x 4
Installation
100 mm
(4.0 inch)
57 mm
(2.24 inch)
.
9