3 Preparation

3
Preparation
3.1

Preparing installation site

3.1.1
Installation site requirements of the
outdoor unit
Mind the spacing guidelines. See the "Technical data" chapter, and
the figures on the inside of the front cover.
INFORMATION
The sound pressure level is less than 70 dBA.
The outdoor unit is designed for outdoor installation only, and for
ambient temperatures ranging:
Model
Cooling
RZQG
–15~50°C
4

Installation

4.1

Mounting the outdoor unit

4.1.1

To provide the installation structure

Prepare 4 sets of anchor bolts, nuts and washers (field supply) as
follows:
(mm)
a
Make sure not to cover the drain holes.
INFORMATION
The recommended height of the upper protruding part of
the bolts is 20 mm.
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with
resin washers (a). If the coating on the fastening area is
stripped off, the nuts rust easily.
a
Installation manual
4
Heating
–20~15.5°C
4× M12
a
4.1.2

To install the outdoor unit

4.1.3

To provide drainage

Make sure that condensation water can be evacuated properly.
INFORMATION
If necessary, you can use a drain plug kit (field supply) to
prevent drain water from dripping.
NOTICE
If drain holes of the outdoor unit are covered by a mounting
base or by floor surface, raise the unit to provide a free
space of more than 150 mm under the outdoor unit.
Drain holes (dimensions in mm)
A
160
620
B
36
61
262
416
595
A
Discharge side
B
Distance between anchor points
C
Bottom frame
D
Drain holes
E
Knockout hole for snow
RZQG71L9V1L + RZQG71~125L8Y1L + RZQG140L7Y1L
4× M12
160
C
D
E
Split system air conditioners
4P473073-1 – 2017.03