Crown EMT-6-6 Installation & Operation Manual page 18

Direct steam kettles on electric boiler cabinet base
Hide thumbs Also See for EMT-6-6:
Table of Contents

Advertisement

INSTALLATION AND OPERATION MANUAL, DIRECT STEAM KETTLES MOUNTED ON
MODELS EMT-6, EMT-10, EMT-12, EMT-6-6, EMT-10-6, EMT-10-10
TO CALIBRATE PRESSURE SWITCHES (Continued)
Adjust in the following sequence:
S
High limit pressure switch.
S
Operating pressure switch.
S
Turning screw clockwise to increase, counterclockwise to decrease pressure.
S
Use relief valve to release pressure from boiler for settling adjustments.
1. HIGH LIMIT PRESSURE SWITCHES
Allow pressure to build until unit shuts off. This should occur at 15 psi. Set the high signal
to switch at 14.5 psi on the gauge and the low signal to 13.0 psi.
2. OPERATING PRESSURE SWITCHES
Set the high signal to switch at 11 psi on the gauge and the low signal to 9 psi.
3. Release pressure in boiler to below 9 psi. Burner will come on. Once pressure has
reached 11 psi, burners will shut off. Repeat this process several times to make sure
burners come on at 9 psi and shut off at 11 psi.
Once completed, pressure switches have been calibrated.
SERVICE
Contact your local authorized service office for any repairs or adjustments needed on this
equipment.
PART NUMBER 10071R2
ELECTRIC BOILER BASE CABINET,
18
2005-08-08

Advertisement

Table of Contents
loading

Table of Contents