Water Pipe Installation - Samsung AG010KSV Series Installation Manual

Dvm chiller
Table of Contents

Advertisement

Maintenance

Water pipe installation

DVM CHILLER
Water side heat
exchanger
02
01
No.
01
02
03
04
05
06
If water (brine) pipe is not maintained periodically, it may affect the operation and may cause noise, maintenance,
and service difficulty.
Water (Brine) pipe should be insulated and proofed well. If insulation and proofing is not enough, there may be
much heat loss, and also cause freeze damage during winter time.
When using indoor units such as fan coil (two or more), pipe resistance from the product to heat exchanger should
be equal.
Install the expansion vessel, which can absorb expansion and contraction of water due to temperature change, and
offset the pressure of supply water, at the highest place. Do not install valves between the expansion vessel and
the pipe.
In case of air inside the pipe cannot be eliminated due to the pipe structure, install automatic air valve at the
highest place among pipes.
When using expansion vessel or automatic air valve, give 1/250 slant to horizontal pipes.
Water or brine throughout the product has to be drained by slopes of pipes and first drain valve. If the product is
huge, install drain valves for each main pipes so that draining is easier for winter time maintenance.
Install water (brine) pump at inlet of water (brine) pipe, and install strainer (over 50 Mesh) which is able to clean
and exchange at pump inlet.
Use flexible joint at inlet/outlet of water (brine) pipe to prevent vibration.
Install temperature gauge and pressure gauge at inlet/outlet of water (brine) pipe for checking operation,
maintenance, and service.
Connect water (brine) pipes to the nearest place of the product by coupling, and make the pipe and the product to
be separated. Install valve at inlet/outlet of pipes, drain valve at inlet, and air purge valve at outlet of water (brine)
pipe.
62
English
Direction of water flow
Field scope
05
06
09
07
03
04
Name
Drain pipe
Coupling
Strainer
Drain valve
Temperature gauge
Pressure gauge
08
Cleaning and flushing pipe
(Install when cleaning)
09
10
No.
07
08
09
10
11
12
Expansion vessel
12
08
11
Name
Valve
Air vent valve
Check valve
Pump
Flexible joint
Expansion vessel