Withdrawing The Power Cable; Installing The Solution Device; Grounding Work - Samsung AG010KSV Series Installation Manual

Dvm chiller
Table of Contents

Advertisement

Electrical wiring work

Withdrawing the power cable

Connect the power cable protection tube into the power
supply box. Be sure that the power supply cable is not
damaged by burr on the knock-out hole.

Installing the Solution device

F1
Terminal block with inverter controller
F2
OF1
OF2
R1
Terminal block with solution device
R2
40
English
F1
F2
OF1
OF2
R1
R2
and hydro controller
-

Grounding work

The grounding must be done by a qualified installer for
safety.
Grounding the power cable
The standard of grounding may vary according to
the rated voltage and installation place of the air
conditioner.
Ground the power cable according to the following
table.
Installation
place
High
Power
humidity
condition
Voltage to
ground is lower
than 150 V
Voltage to
Must perform the grounding work 3.
ground is over
Note 1)
(Including the case where earth
150 V
leakage breaker is installed)
Note 1)
About grounding work 3.
Grounding work must be done by an expert (with
qualification).
Check if the grounding resistance is lower than
100 Ω. When installing an earth leakage breaker (that
can cut the electric circuit within 0.5 second in case
of a short circuit), allowable grounding resistance
should be 30 ~ 500 Ω.
Note 2)
Grounding at dry place
Check if the grounding resistance is lower than
100 Ω. Check if the grounding resistance is lower
than 250 Ω.
Average
Low
humidity
humidity
Must
Must
perform
perform
the
the
grounding
grounding
work 3.
work 3.
Note 1)
Note 2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents