5. Using a 5/32” drill bit on a drill, from the outside of the unit cut holes through the unit’s insulation for the line set and drain line. 1738 E. Alpine Ave • Stockton, CA 95205 • 1(800) 343-9463 • www.whisperkool.com UNIT SPECIFIC INSTALLATION GUIDE • Ladder • Level...
Page 2
16. Reinstall the access panel removed in step 1 of Evaporator Preparation. 17. Plug in the evaporator and condensing unit. 18. Follow standard refrigeration system charging processes. WhisperKOOL recommends pressurizing the sys- tem using dry nitrogen, then allow unit to hold pressure for 30 minutes prior to charging.
Need help?
Do you have a question about the Platinum 042610 and is the answer not in the manual?
Questions and answers