Preparation And Wiring Diagrams - Delta breez VFB25ADH Instructions Manual

Humidity sensing bath fan
Hide thumbs Also See for breez VFB25ADH:
Table of Contents

Advertisement

PREPARATION
Tools Required for Assembly (not included): Hammer,
Flathead Screwdriver, Wire Nuts, Nails, Duct Tape,
Phillips Head Screwdriver, Utility Knife
Helpful Tools (not included): Electric Drill, Drill Bits
WARNING: Turn off electricity at breaker box
before beginning installation.
Carefully remove unit from carton.
Check area above installation location to be sure that
wiring can run to the planned location and that duct
proper ventilation.
Inspect duct work and wiring before proceeding with
installation.
Before installation, provide inspection and future
maintenance access at a location that will not
interfere with installation work.
You may need the help of a second person to install
this fan: one person on the attic side and one on the
room side.
Note: Installations may vary depending on how the
previous bath fan was installed. Supplies necessary
for the installation of your bath fan are not all included.
However, most are available at your local home
improvement or hardware store.
DIMENSION REQUIREMENTS
Ceiling
Ceiling
Opening (L)
Opening (W)
10.25 in.
10.25 in.
Housing
Housing
Dimension (L)
Dimension (W)
9.68 in.
9.68 in.
WIRING DIAGRAM
JUNCTION BOX
BLACK
WHITE
GREEN
Note: Do not use with timer switch.
Model:
VFB25ACH / VFB25ADH / VFB25AEH
Ceiling
Opening (H)
8.5 in.
Housing
Dimension (H)
7.98 in.
SWITCH BOX
OFF
L
ON
POWER SWITCH
N
GRD
4
Proper insulation around the fan to minimize building
heat loss and gain. 4" circular duct is recommended
for installation. The ducting from this fan to the outside
of building has a strong effect on the air flow, noise
and energy use of the fan. Use the shortest, straightest
duct routing possible for best performance, and avoid
installing the fan with smaller ducts than recommended.
Insulation around the ducts can reduce energy loss and
inhibit mold growth. Fans installed with existing ducts
may not achieve their rated air flow.
Short piece of flexible
duct helps alignment
and absorbs
sound
Fan housing
Seal gap
Caulk termination
around
to duct
housing
Locate unit above (GFCI-protected circuit required)
or within 5 feet of the shower head.
Locate unit away from heating or cooling sources
which can affect humidity levels.
Do not locate near window. Unit may respond to the
outdoor humidity level.
Unit must be installed in ceiling to properly sense
moisture.
proper sensing.
The fan will operate most efficiently when located
where the shortest possible duct run and minimum
number of elbows will be needed.
Use a roof cap or wall cap that has a built-in damper
to reduce backdrafts.
WHITE
BLACK
ON/OFF SWITCH
SWITCH BOX
(purchase separately)
POWER
SWITCH
120 VAC
LINE IN
Roof cap
(with built-in
damper)
or
Wall cap
(with built-in
damper)
GROUND
(bare)
WIRING
PLATE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breez vfb25achBreez vfb25aeh

Table of Contents