Download Print this page

Monte Carlo Fan Company Loft 96 6LFR96 Series Owner's Manual And Installation Manual page 4

Advertisement

7
Downrod
Canopy
Canopy bottom
cap
Yoke cover
Place downrod over canopy, canopy
bottom cap and yoke cover
10
Screwdriver
For easy assembling of the
Helpful hint:
cross pin on the next installation step.
After slip downrod into the motor yoke,
carefully insert a Phillips screwdriver through
the yoke and downrod ( don't damage the
lead wires ) as a guide and then push the
cross pin and pull the screwdriver in the
meantime as shown in the inset.
© 2020 Monte Carlo Fan Collections
8
Partially loosen downrod set screws from
yoke at top of motor assembly.
11
Cross pin
Keeper pin
Slip downrod into motor housing yoke,
aligning holes and install cross pin and keeper
pin.
Insert cross pin through yoke and downrod
until point appears on the other side, and
insert keeper pin on cross pin.
Pull the downrod up tight against the cross
pin, and then evenly tighten the downrod set
screws on motor housing yoke.
Place Yoke cover on motor assembly.
Warning: Cross pin and keeper pin must be
installed securely, failure to install them will
result in serious injury.
Yoke
Cross pin
4
9
Thread lead wires and safety cable from
motor assembly through downrod.
12
Tab
Install ball end of downrod into mounting
bracket opening. Align (engage) slot on
ball with tab on mounting bracket.
Warning: Failure to align slot on ball with
tab may result in serious injury.
Important: If using the angle mount,
make sure open end of mounting bracket
is installed facing the higher point of the
ceiling and make sure the ceiling angle is
not steeper than 20º. Longer downrod
may be necessary allowing the fan blades
to rotate without obstructions.
Slot
Downrod
1/2020

Advertisement

loading

This manual is also suitable for:

Loft 96 6lfr96pbsdLoft 96 6lfr96rzwdLoft 96 6lfr96mbkd