Monogram Advantium ZSB9231NSS Installation Instructions Manual page 6

Built-in wall oven 240v 30”
Hide thumbs Also See for Advantium ZSB9231NSS:
Table of Contents

Advertisement

Available languages

Available languages

IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined
installation.
PREPARE THE OPENING
Installation over a Wall Oven:
30"
17-1/2"
45-1/4"
Min.
• If you are replacing an electric double oven with the
combined installation of an Advantium 240V and a
single oven, use the dimensions shown. The middle
rail separating the two openings may need to be
larger than the 2" minimum shown.
6
Standard Installation Preparation
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported by
2x4 or 2x2
25-1/4"
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
PREPARE THE OPENING
Installation over a Wall Oven and
Warming Drawer:
30"
23-1/2"
25-1/4"
17-1/2"
45-1/4"
Min.
Per warming drawer requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the mounting
surface must be capable of supporting the cabinet
load, in addition to the added weight of the oven and
drawer, plus additional oven loads.
(CONT.)
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
2" Min.
31-7000080 Rev. 2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Advantium zsb9232nss

Table of Contents