Disassembly/Assembly Procedures Of Deck Mechanism - Toshiba D-VR7KC Service Manual

Dvd video recorder/video cassette recorder
Table of Contents

Advertisement

DISASSEMBLY/ASSEMBLY PROCEDURES
Before following the procedures described below, be sure to remove the deck assembly from the cabinet. (Refer
to CABINET DISASSEMBLY INSTRUCTIONS of Main Section.)
All the following procedures, including those for adjustment and replacement of parts, should be done in Eject
mode; see the positions of [41] and [42] in Fig. DM1 on page 2-4-3. When reassembling, follow the steps in
reverse order.
Step
Starting
/Loc.
No.
No.
[1]
[1]
Guide Holder A
[2]
[1]
Cassette Holder Assembly
[3]
[2]
Slider (SP)
[4]
[2]
Slider (TU)
[5]
[4]
Lock Lever
[6]
[2]
Cassette Plate
[7]
[7]
Cylinder Assembly
[8]
[8]
Loading Motor Assembly
[9]
[9]
ACE Head Assembly
[10]
[2]
Tape Guide Arm Assembly
[11]
[10]
C Door Opener
[12]
[11]
Pinch Arm (B)
[13]
[12]
Pinch Arm (A) Assembly
[14]
[14]
FE Head
[15]
[15]
Prism
[16]
[2],[15] Sensor Gear
[17]
[2]
Slider Shaft
[18]
[17]
C Drive Lever (SP)
[19]
[17]
C Drive Lever (TU)
[7],[8],
[20]
Capstan Motor
[10]
[21]
[21]
Clutch Assembly
[22]
[22]
Cam Holder Assembly
[23]
[23]
Cam Gear (B)
[24]
[24]
Mode Gear
[25a] [1], [25a] Holder ML SHARP HI-Speed B
[21],
[25]
Mode Lever
[23], [24]
[26]
[22]
Worm Holder
[27]
[26]
Pulley Assembly
[28] [25], [26] Cam Gear (A)
[29]
[25]
Idler Gear
[30]
[29]
Idler Arm
OF DECK MECHANISM
Part
Fig. No.
T
DM3
T
DM4
T
DM5
T
DM5
T
DM5
T
DM5
T
DM1, DM6
T
DM1, DM7
T
DM1, DM7
T
DM1, DM8-1
T
DM1, DM8-1
DM1, DM8-1,
T
DM8-2
DM1, DM8-1,
T
DM8-2
T
DM1, DM9
T
DM1, DM9
T
DM1, DM9
T
DM10
T
DM10
T
DM10
B
DM2, DM11
B
DM2, DM12
B
DM2, DM12
B
DM2, DM12
B
DM2, DM13-1 (C-3)
DM2, DM13-1 (S-8a)
DM2, DM13-1,
B
DM13-2
B
DM2, DM13-1 (S-9), *(L-9), *(L-10)
B
DM2, DM13-1
DM2, DM13-1,
B
DM13-2
B
DM1, DM14
B
DM1, DM14
2-4-1
Removal
Remove/*Unhook/
Unlock/Release/
Unplug/Desolder
2(S-1)
(S-1A), *(L-1)
*(L-2)
*(L-3), *(P-1)
Desolder, 3(S-2)
Desolder, LDG Belt,
2(S-3)
(S-4)
*(P-2)
(S-4A), *(L-4)
*(P-3)
(S-5)
(S-6)
*(L-5)
(S-7), *(P-4)
3(S-8), Cap Belt
(C-1)
*(L-6)
(C-2), *(P-5)
(C-4), *(L-8)
*(L-11)
Installation
Adjustment
Condition
MK14NDA_T

Advertisement

Table of Contents
loading

Table of Contents