Standard Maintenance - Toshiba D-VR7KC Service Manual

Dvd video recorder/video cassette recorder
Table of Contents

Advertisement

Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Ref.No.
B2
Cylinder Assembly
B3
Loading Motor Assembly
B8
Pulley Assembly
B587
Tension Lever Assembly
B31
ACE Head Assembly
B573, B574
Reel (SP)(D2), Reel (TU)(D2)
B37
Capstan Motor
B52
Cap Belt
B73
FE Head
B133, B134
Idler Gear, Idler Arm
B410
Pinch Arm (A) Assembly
B414
M Brake (SP) Assembly
B416
M Brake (TU) Assembly
B525
LDG Belt
B593
Cam Holder Assembly
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head)
using 90% ethyl alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.

STANDARD MAINTENANCE

Deck
Part Name
Periodic Service Schedule
1,000 h
2,000 h
I
I
I
I
I
I
I
I
I
I
I
2-1-1
3,000 h
4,000 h
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
MK14MEN_T

Advertisement

Table of Contents
loading

Table of Contents