Power On; Initialization - TP-Link TL-SX3206HPP Installation Manual

Hide thumbs Also See for TL-SX3206HPP:
Table of Contents

Advertisement

3.5

Power On

Plug the female connector of the provided power cord into the power socket of the device and plug
the positive connector into a power outlet as the following figure shows. Make sure that the voltage
of the power supply meets the requirement of the input voltage (100-240 V~ 50/60 Hz).
Figure 3-5
Connecting to Power Supply
Note:
The figure is to illustrate the application and principle. The provided plug and the socket in your
region may differ from the figures above.
3.6

Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically
to ensure the device functions properly. During this time, its LED indicators will respond in the
following order:
1. The PWR LED indicator lights on all the time. The SYS LED and the LED indicators of all the ports
keep off.
2. After about one minute, the SYS LED and LED indicators of all the ports will flash momentarily and
then turn off.
3. Several seconds later, the SYS LED indicator will flash, which represents a successful initialization.
JetStream L2/L2+ Managed Switch
Connection
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-sx3008fTl-sg3210Tl-sg3210xhp-m2Tl-sg3428Tl-sg3428mpTl-sg3428x ... Show all

Table of Contents