Mitsubishi Electric MUZ-HJ25VA-E2 Service Manual page 44

Outdoor unit
Table of Contents

Advertisement

11-5. TROUBLESHOOTING FLOW
A How to check inverter/compressor
Disconnect the connector (CN61) between
compressor and the power module (IC700).
Check the voltage between terminals.
Are the voltages balanced?
Check the compressor.
B Check of open phase
● With the connector between the compressor and the power module disconnected, activate the inverter and check if the in-
verter is normal by measuring the balance of voltage between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION : Refer to 8-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE : 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board fl ashes 9 times. (Refer to 11-6.1.)
OBH648F
No
Yes
Measure AC voltage between the lead wires at 3 points.
See 11-5.
"Check of open phase".
Replace the inverter P.C. board.
See 11-5.
"Check of compressor".
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents