Working Field; Overall Dimensions; Boiler Fixing - Riello G10 LC Installation, Use And Maintenance Instructions

Light oil burner
Table of Contents

Advertisement

WORKING FIELD

0.8
0.6
0.4
0.2
0
4
5
50
60
D5669

OVERALL DIMENSIONS

Flange
189
140
170

BOILER FIXING

It is necessary that the insulating gasket
(9, fig. 1) is placed between the boiler door
and the burner flange.
This insulating gasket has six holes,
which, if necessary, can be modified as
shown on the drawing on the right.
Verify that the installed
burner is lightly leaned
towards the button.
(See figure 2).
The burner is designed to
allow entry of the flexible
oil-lines on either side of
the burner.
20013654
(as EN 267)
6
7
70
80
90
8
9
10
100
110
120
Burner
305
=
=
D5242
Fig. 2
D5572
GB
2
Fuel output - kg/h
Thermal power - kW
108
40
BURNER FIXING AND
HINGE ASSEMBLY
261
D5670
S7385

Advertisement

Table of Contents
loading

This manual is also suitable for:

20013617

Table of Contents