Introduction; Initial Inspection - Agilent Technologies 87512A Operation And Service Manual

Transmission/reflection test kit
Table of Contents

Advertisement

Installation

INTRODUCTION

This chapter explains how to install the 87512A/B test kit for use with the network analyzer.
The topics covered include initial inspection, environmental considerations, positioning and
connecting the test kit for use, and packaging the instrument.

INITIAL INSPECTION

Inspect the shipping container (including cushioning material) for damage. If it is damaged,
keep it until you have checked the contents for completeness. The contents are listed in
Table 2-1.
In addition, check the test kit mechanically and electrically. If the test kit and shipping
container are undamaged, performing the operation veri cation in Chapter 4 should suce for
incoming inspection. If the test kit does not pass the veri cation, refer to the troubleshooting
procedures in Chapter 5.
If the shipping container is damaged and the test kit fails the veri cation procedure, or is
damaged, defective, or incomplete, keep the shipping materials and notify both the carrier and
the nearest Agilent Technologies oce. The Agilent Technologies oce will arrange for repair
or replacement of the test kit without waiting for settlement of the claim.
Component
Resistive Signal Divider
Carrying case
Semi-rigid cable
Precision SHORT termination
Precision LOAD termination
Minimum loss pad
DUT return cable
only for the 87512B
1
Table 2-1. Contents of the 87512A/B
1
Agilent Model/Part Number
87512A
87512-61001
87512-60011
41952-61601
11512A
909C (Opt. 012)
Not included
8120-4666
87512B
87512-61002
87512-60012
41952-61601
85036-60012
909E
11852B
8120-4666
Installation
2
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

87512b

Table of Contents