BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHAX0608FGD4MW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHAX0608FGD4MW-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 03DTSHAX0608FGD4MW-V1 Please retain product label and instructions for future reference 6x8 Summer House 6x8 Summer House with Veranda Pack Required: 03DTSHAX0608FGD4MW-V1 QTY 1 Pack Required: Overall Dimensions: 03DTSHAX0608FGD4MW-V1 QTY 1 Width = 2494mm 03DTSHAX0208WCVPB-V1 QTY 1 Depth = 2457mm Overall Dimensions:...
  • Page 3 03DTSHAX0608FGD4MW-V1 Please retain product label and instructions for future reference Building Content - Pack A 03DTSHAX0608FGD4MW-V1 Door Framing 28x28x940mm QTY 1 FS2828-940mm Gable Cover Trims 12x30x610mm QTY 4 S1230-610mm Cover Trims 12x40x1712mm QTY 7 S1240-1712mm Door Frame Strip 12x40x996mm QTY 1...
  • Page 4 Please retain product label and instructions for future reference Building Content - Pack B Building Content - Pack C 03DTSHAX0208NWPB-V1 03DTSHAX0208WCVPB-V1 Floor Blocks QTY 8 F2828-400mm Floor Extension QTY 1 Ridge Bar 27x70x599mm QTY 1 AI-R11MBF2350X600-V1 Rail QTY 2 F2770-599mm Veranda Floor QTY 1 AI-03FR600X595-V1 AI-R11STVF2380X622-V1...
  • Page 5: Pre-Assembly

    Please retain product label and instructions for future reference 2ft EXTENSION PACK Pre Assembly Step 1a Before assembling remove the transportation Parts needed - No. 6 QTY 2 blocks from the bottom of each panel. - No. 29 QTY 1 - No.
  • Page 6 Please retain product label and instructions for future reference Step 3 IMPORTANT: Pre-drill before xing screws. Step 2 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.2 QTY 1 Parts Needed- No.2 QTY 1 - No.3 QTY 1 - No.3 QTY 1 Place the Side panel (No.2) and the Back Place the Side panel (No.2) and the Back Panel (No.3) along side the standing panels.
  • Page 7 Please retain product label and instructions for future reference Step 4 IMPORTANT: Pre-drill before xing screws. 2ft EXTENSION PACK Parts Needed- No.1 QTY 2 10x8 SUMMER HOUSE ONLY Step 4a Place the Side Window panels (No.1) onto the oor. Fix in an alternating pattern using Parts Needed- No.31 QTY 2 3x50mm screws per panel.
  • Page 8 Please retain product label and instructions for future reference Step 5 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.7 QTY 2 Parts Needed- No.12 QTY 1 Place the Front Window panel (No.7) onto the Place the Door Framing (No.12) onto the oor, x the corners using 3x50mm screws oor, between the Front Window Panels.
  • Page 9 Please retain product label and instructions for future reference Step 8 Step 9 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.19 QTY 1 Parts needed - No. 5 QTY 2 - No.24 QTY 2 For 2ft Extension Pack, go to Step 9a Fix the Corner Braces (No.24) to each end on the next page of the Ridge Bar (No.19) using 2x30mm...
  • Page 10 2ft EXTENSION PACK 2ft EXTENSION PACK Step 9a Continued Step 9a 8x8 Summer House Parts Needed 8x8 Summer House Parts Needed - No.34 QTY 2 - No.5 QTY 2 8x8 Summer - No.30 QTY 2 House 10x8 Summer House Parts Needed 10x8 Summer House Parts Needed - No.34 QTY 4 - No.5 QTY 2...
  • Page 11 Please retain product label and instructions for future reference Step 10 Step 11 IMPORTANT: Pre-drill before xing screws. Once the roof is xed, attach the build- Parts Needed- No.4 QTY 4 ing to the Floor with 50mm screws. - No.25 QTY 16 Ensure the screws go through the panel Fix the Window Blocks (No.
  • Page 12 Please retain product label and instructions for future reference Step 14 IMPORTANT: Pre-drill before xing screws. Step 12 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.15 QTY 1 Parts Needed- No.8 QTY 1 Internal View - No.16 QTY 2 - No.9 QTY 1 - No.22 QTY 6 On the inside of the building x the Door Frame Strips (No.15 and No.16), to the...
  • Page 13 Please retain product label and instructions for future reference Step 16 IMPORTANT: Pre-drill before xing screws. Step 18 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.28 QTY 2 Parts Needed- No.14 QTY 7 Attach the tower bolts (No.28) to Fix the Cover trims (No. 14) to each the top and bottom of the corner and over the panel joins, secondary door using 4x20mm...
  • Page 14 Please retain product label and instructions for future reference Step 19 Step 20 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.13 QTY 4 Parts Needed- No.27 QTY 1 Fix the Gable Cover Trims (No.13) to Cut the Felt (No. 27) into 3 sheets of 2510mm the building with 2x30mm screws and lay onto the roof in the order shown in the per Trim.
  • Page 15 Please retain product label and instructions for future reference Step 21 VERANDA PACK IMPORTANT: Pre-drill before xing screws. Parts Needed- No.18 QTY 4 Step 20b - No.26 QTY 2 Parts Needed- No.35 QTY 4 Fix the Fascia (No. 18) to each end Place the Veranda (No.35) at the front of the of the roof, securing with 3x30mm building, ush to the front of the building.
  • Page 16 Please retain product label and instructions for future reference Step 22b Step 24b Parts Needed- No.37 QTY 2 Parts Needed- No.27 QTY 1 Fix the Roof Support (No.37) to Cut the Felt (No. 27) into 3 sheets of 2510mm the building by screwing through and lay onto the roof in the order shown in the the roof into the top of the fram- diagram.
  • Page 17 Please retain product label and instructions for future reference Step 25b Parts Needed- No.18 QTY 4 - No.26 QTY 2 Fix Fascia (No. 18) to each end of the roof, securing with 3x30mm crews per Fascia. Ensure the screws go through the roof fram- It is ESSENTIAL that you apply wood treatment immediately after the building Fix the Diamond Finials (No.26) to...