Delta M125HV 110 Installation And Operation Manual page 65

Solar
Table of Contents

Advertisement

6.6.4.3 Wiring for multiple inverters
Data logger
Installation and Operation Manual M125HV EU V3 EN 2021-07-12
...
Connecting the communication card
1. On the cable coming from the data logger: Connect the
DATA+ wire to terminal 5 and the DATA– wire to terminal
6.
On the cable going to the second inverter: Connect the
DATA+ wire to terminal 3 and the DATA– wire to terminal
4.
2. Set the DIP switch for the RS485 termination resistor
(DIP 2) to the OFF position.
6 Installation
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

M125hv 111Rpi124m110000Rpi124m111000

Table of Contents