Gree GWH09AGA-K6DA1A Service Manual page 129

Table of Contents

Advertisement

Step
10.Remove Electric Box Assy
Remove screws fixing the electric box
subassembly; loosen the wire bundle and
unplug the wiring terminals. Then lift the
electric box to remove it.
11. Remove isolation sheet
Remove the screws fixing the isolation
sheet and then remove the isolation
sheet.
12.Remove compressor
a
Unsolder the welding joint connecting the
capillary, valves and the outlet pipe of
condenser to remove the capillary. Do not
block the capillary with welding slag
during unsoldering.
Unsolder the welding joint connecting the
b
capillary, valves and the outlet pipe of
condenser to remove the capillary. Do not
block the capillary with welding slag
during unsoldering.
126
Procedure
Electric Box Assy
isolation sheet
cut-off valve
Service Manual
4-way valve
Installation and Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents